home Bali, Mesin TRAINING CHILLER AND COOLING TOWER DESIGN

TRAINING CHILLER AND COOLING TOWER DESIGN

TRAINING CHILLER AND COOLING TOWER DESIGN, AND OPERATION

TRAINING OPERATION FOR COOLING TOWER SYSTEM

TRAINING DESIGN FOR COOLING TOWER SYSTEM

TRAINING CHILLER AND COOLING TOWER DESIGN

DESKRIPSI

Chiller and cooling tower are used in HVAC, power plant and refrigeration system. Design and operation of the equipments are very important to know for an engineer. This course covers the fundamentals and practical applications for understanding of design and operation of the chiller and cooling tower. The comprehensive coverage of the basic theory, system analysis, optimization concept, and calculation methods to make this the most complete course available today in achieving an economical system.

A.MATERI

1.    Chiller System and Basics
a.    Work Principle of Chiller
b.    Piping Basics
c.    Pumping Basics
d.    Control Valve Basics
e.    Loop Control Basics
f.    Air-Cooled Chillers
g.    Water-Cooled Chillers
h.    Piping and Diversity
2.    Chiller Construction and Safety
a.    Dual Compressor Chillers
b.    VFD Chillers
c.    System Design Changes
d.    Mechanical Room Safety Standard
e.    Single Chiller System
3.    Basic Operation and Arrangement of Chiller
a.    Basic Components
b.    Series Chillers System
c.    Single Chiller Sequence of Operation
d.    Parallel Chiller System
e.    Parallel Chiller Sequence of Operation
f.    Series Counterflow Chillers
g.    Using VFD Chillers in Series Arrangements
h.    System Comparison
i.    Very Large Chiller Plants
j.    Primary/Secondary Sequence of Operation
4.    Chiller Cooling System
a.    Water-Side Free Cooling

b.    Direct Waterside Free Cooling
c.    Parallel Waterside Free Cooling
d.    Series Waterside Free Cooling
e.    Waterside Free Cooling Design Approach
f.    Waterside Free Cooling Sequence of Operation
g.    Chilled Water Volume
h.    Chilled Water Temperatures and Ranges
i.    Minimum Chilled Water Volume
j.    Estimating System Volume
k.    Evaluating System Volume
5.    Cooling Tower
a.    Cooling Tower Types and Cooling Tower Systems
b.    General Design Consideration
c.    Cooling Tower Construction and Installation Requirements
d.    Tower materials
e.    Cooling Tower Design and Operation Consideration
f.    Cooling Tower Water and Bleed-off Water Control
g.    Improving Energy Efficiency of Cooling Towers
6.    Hybrid Plants and Energy Saving
a.    Heat Recovery and Templifiers
b.    Load Profiles
c.    Heat Recovery Chillers
d.    Variable Primary Flow Design
e.    Variable Primary Flow Sequence of Operation
f.    Low Delta T Syndrome
g.    Low Delta T Example
h.    Low Delta T Syndrome Causes and Solutions

B.PESERTA

Technicians, ME engineers and other who responsible for selecting, mechanical equipments.

INSTRUKTUR

Instruktur yang mengajar pelatihan Chiller And Cooling Tower Design ini adalah instruktur yang berkompeten di bidang Chiller And Cooling Tower Design baik dari kalangan akademisi maupun praktisi.

Jadwal pelatihan trainingmekatronika.com tahun 2024 :

  • Batch 1 : 03 – 04 Januari 2024 | 16 – 17 Januari 2024
  • Batch 2 : 07 – 08 Februari 2024 | 20 – 21 Februari 2024
  • Batch 3 : 05 – 06 Maret 2024 | 19 – 20 Maret 2024
  • Batch 4 : 09 – 10 April 2024 | 13 – 24 April 2024
  • Batch 5 : 07 – 08 Mei 2024 | 22 – 23 Mei 2024
  • Batch 6 : 05 – 06 Juni 2024 | 25 – 29 Juni 2024
  • Batch 7 : 09 – 10 Juli 2024 | 23 – 24 Juli 2024
  • Batch 8 : 06 – 07 Agustus 2024 | 20 – 21 Agustus 2024
  • Batch 9 : 04 – 05 September 2024 | 18 – 19 September 2024
  • Batch 10 : 18 – 19 Oktober 2024 | 15 – 16 Oktober 2024
  • Batch 11 :06 – 07 November 2024 | 26 – 27 November 2024
  • Batch 12 : 04 – 05 Desember 2024 | 18 – 19 Desember 2024

Catatan : Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta training chiller and cooling tower pasti jalan

Invetasi dan Lokasi pelatihan design for cooling tower system di bali :

· Yogyakarta,

· Jakarta,

· Bandung,

· Bali,

· Surabaya,

· Lombok,

Catatan : Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas  pelatihan chiller and cooling tower di bali :

  • FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara/Stasiun/Terminal)
  • FREE Akomodasi ke tempat pelatihan bagi peserta training design for cooling tower system bali pasti running
  • Module / Handout training operation for cooling tower system bali fixed running
  • FREE Flashdisk
  • Sertifikat training CHILLER and COOLING TOWER Design, and Operation di bali murah
  • FREE Bag or bagpackers (Tas Training)
  • Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  • 2xCoffe Break & 1 Lunch, Dinner
  • FREE Souvenir Exclusive
  • Training room full AC and Multimedia

.